Faza Water Supply Project:
Country:
Clinet:
- Embassy of Islamic Republic of Iran in Kenya- Lamu County Government
Objective:Conveying 75 CM water per day from mainland to the Faza Island
Status of project:completed in 2014
Location:Faza Island, South east of Kenya in Indian Ocean.
Water resource: Wells in the mainland
Length of pipe line: 14 Km (4 Km in the mainland, 10 Km subsea pipe laying)
Pipe diameters:90 mm
Transmission rate:1.7 lit/sec
Consumption:Faza village drinking water
Pipe material: HDPE
Transmission type:
Pumping
Pumping Head:
60 m
No. of pump stations:
2
No. of pumps:
3 units
Electricity demand:
3 generators with the capacity of each 5.5 KVA